Team,
Here are some responses to Aunt Liz's questions she posed to me, which were good ones.
Re: the doors: Will the teak or mahogany wood stand up> weatherwise? Or should the doors be metal, as they are now?
Hardwood (or any wood) doors require occasional maintenance. A recoat of protective stain every two years or so. This is a cost implication we will have to measure. To me, its a small price to pay to have a unique entrance door. Aluminum storefront doors are standard for a reason, but also are boring.
the windows: Will the shortened windows give enough light to the interior, and will they present a visually strong appeal from the exterior?
My assumption for now based on my interviews with the tenants is that maximizing natural light is important, as well as some visibility. But I have not heard from any tenant that displaying the products in the windows is crucial to the success of their business. (In fact, some tenants are storing boxes of inventory against the windows right now, giving a sloppy image to the building. Therefore, I think the less glass the better. Less glazing = less cost = less energy use. However, since it is also crucial for our design to make your tenants happy, we need to walk the fine line between what your tenants feel they need and what we feel we need. As for the "curb appeal" so to speak, the 3D drawings I will continue to produce in increasing detail should speak for themselves.
-George
Wednesday, December 19, 2007
Tuesday, December 18, 2007
Schematic Design Presentation
I have prepared three schematic design concepts for you all to chew on (along with your yummy holiday meals) over the next few weeks. I created all three design schemes to augment a basic approach to address the remodel of the existing facade. I will email you the pdf file along with this post.

This basic premise assumes that we are completely removing the storefront windows, doors, roofing details, etc. and starting from scratch. The new design assumes that we first raise the existing facade by adding a parapet (a section of wall above the roof basically) to the existing building on all three sides but the rear facade, which has the gutters and drainage downspouts to drain the roof water. The existing roof is about 13'-3" high. I propose to add a 3'-6" parapet wall to raise the new visual building height to 16'-9". The existing roof height will remain the same. To simplify the design and minimize cost, I am proposing adding a simple new window design which greatly reduces the amount of glass in the facade (and saves on energy as well as construction costs) while giving the building a sleek, modern look (see the first partial elevation drawing of the presentation).
I have removed the recessed entrances for now) and have given the stores the reclaimed space. The new storefront doors I propose to be made of really nice wood (like teak or mahogany) and set in a standard storefront frame. This will give some richness to the facade.
Please give the pdf file a look. If you need help on downloading it, I'll walk you through it. Keep something in mind. I have not really gotten into materials or color choices yet. The colors in the pictures are meant to accentuate the forms and ideas only. We can choose colors and materials later.
Happy viewing!!!
-George
Wednesday, October 17, 2007
MEMORANDUM
To: Lila Nigh
Elizabeth Stiles
Elaine Schevon
From: George
Re: Project Status
Team,
Welcome to our official "Blog" project website! As you may already know, I am traveling back east this week and will be measuring and photographing the existing stores and storefront so that I can prepare measured as-built drawings from which to design the new storefront.
I will be at the site on Wednesday and will be meeting with the Structural engineer at 2PM on thursday to discuss the existing structural conditions of the storefront. I plan to begin formal schematic design in the next coming weeks.
Elizabeth Stiles
Elaine Schevon
From: George
Re: Project Status
Team,
Welcome to our official "Blog" project website! As you may already know, I am traveling back east this week and will be measuring and photographing the existing stores and storefront so that I can prepare measured as-built drawings from which to design the new storefront.
I will be at the site on Wednesday and will be meeting with the Structural engineer at 2PM on thursday to discuss the existing structural conditions of the storefront. I plan to begin formal schematic design in the next coming weeks.